Project description
| Client | West Azerbaijan Organization of Agriculture Jihad |
| Consultant | Mahab Ghods Consulting Engineers Co. |
| Contractor | Ghala Co. |
| Contract Duration | Contract Duration |
Diversion system of Simineh Rud Dam consists of two culverts with dimensions of 4*5 and 5*5 meters used to divert the river flow during the construction period. The culverts are also used in operation as lower discharge and irrigation feed to supply the drinking water of Bukan and hydroelectricity power plant.
Excavation of diversion culvert site, bed improvement and concreting the culvert, and mobilization the power plant site are the most important scopes of service in this project.
Concrete casting operation of this project was completed in less than a year with average daily volume of 300 m3.
General Project Specifications
| Earth Works | 379000 m3 |
| Ground Stabilization | 2080 m2 |
| Steel Works | 1974 t |
| Formwork | 18000 m2 |
| Casting | 29000 m2 |