Simineh Rud Dam Diversion System

Project start date

1391

Project description

 

 

Client West Azerbaijan Regional Water Department
Consultant Mahab Ghods Consulting Engineers Co.
Contractor Ghala Co.
Contract Duration 54 Months

 

 

Simineh Rud Reservoir Dam is located in a distance of 21 Km to the southwest of Bukan after conjunction of the main river branches above Shahrikand Village. Construction of the clay-cored earth dam consisted of earthworks, stabilization, excavation and injection, formwork, and casting as well as construction of buildings, roads and general utilities.

Main Project Objectives

  • Supplying 269 million m3 of water per annum to the agricultural lands of Bukan, Shahrikand, Dashband, and left bank of Zarineh Rud
  • Continuous exploitation of 32 million m3 of water from underground water resources during the construction period in order to meet the agricultural needs
  • Long-term supply of 37.5 million m3 of water per annum to Bukan in accordance with 2036 vision
  • Supply of 1 m3/s water to the river environment as well as the excessive current of the middle basin
  • Controlling the Simineh Rud river floods

Dam Specifications

Dam Type Earth Dam with Vertical Clay Core
Height from Foundation 75 m
Length of Crest 1356 m
Width of Crest 12 m
Altitude of Crest 1400 m above the seas level
Reservoir Capacity 363 million m3