Project description
Client | West Azerbaijan Regional Water Department |
Consultant | Abkhan Consulting Engineers Co. |
Contractor | Ghala Co. |
Contract Duration | 30 Months |
Main Project Objectives
Construction of watertight in order to elevate the water level and increasing the reserved water quantity for continuous gravity irrigation of agricultural lands during summertime, controlling the river flow regime and associated floods in order to protect the agricultural lands, construction of canal and correcting cross sections and width of canals derived from Shahrchay river, development of gravity irrigation system and controlling water using floodgates, and development of a modern irrigation grid to prevents waste of water and regular water management were the most important objectives of this project.
General Project Specifications
Excavation and Digging Canals | 278000 m3 |
Backfilling | 281000 m3 |
Stone Masonry Work | 67000 m3 |
Steel Work | 64 t |
Formwork | 24000 m2 |
Concreting | 32000 m3 |