Project description
Client | West Azerbaijan Regional Water Department |
Consultant | Absaran Consulting Engineers Co. |
Contractor | Gilban and Ghala Consortium |
Contract Duration | Contract Duration |
Main Project Objectives
- Regulating the 273 million m3 water flow of Nazlu River to irrigate 431000 hectares of agricultural lands in Nazlu, Rodha, Kohriz, and Ghushchi Planes
- Controlling river floods to prevent damages
- Supply of industrial and drinking water needs of northern townships of Lake Urmia (38-million m3)
- Responding to the environmental needs of Nazlu River in Urmia
- Improving the socioeconomic conditions in the northern parts of the plane
General Specifications of the Dam
Type | Earthen Dam with Vertical Clay Core |
Height | 98 m from the bed |
Length of Crest | 427 m |
Altitude of Crest | 1502 m above the seas level |
Reservoir Capacity | 170-Million m3 |
Access Road | Access Road |