Construction of Downstream Bridge of Zarineh Rud Dam in Bukan

Project start date

2006

Project description

Client West Azerbaijan Regional Water Department
Consultant Mahab Ghods Consulting Engineers Co.
Contractor Ghala Co.
Contract Duration 6 Months

 

Due to important and urgency of the project, construction of the downstream waterfront bridge, with a length of 200 m and width of 6 m, was carried out in wintertime, at a temperature of -30°C. The most important operations of the project were diverting the river, drying the foundation bed, concrete operations, backfilling the bridge piers, asphalting the bridge and waterfront crest, construction of the retaining wall, construction of emergency parking area, installation of guardrails etc.

General Project Specification

Earhworks 110000 m3
Stone Masonry Works 4400 m3
Reinforcement 25 t
Steel Works 86 t