Project description
Client | West Azerbaijan Regional Water Department |
Consultant | Mahab Ghods Consulting Engineers Co. |
Contractor | Ghala Co. |
Contract Duration | 6 Months |
Due to important and urgency of the project, construction of the downstream waterfront bridge, with a length of 200 m and width of 6 m, was carried out in wintertime, at a temperature of -30°C. The most important operations of the project were diverting the river, drying the foundation bed, concrete operations, backfilling the bridge piers, asphalting the bridge and waterfront crest, construction of the retaining wall, construction of emergency parking area, installation of guardrails etc.
General Project Specification
Earhworks | 110000 m3 |
Stone Masonry Works | 4400 m3 |
Reinforcement | 25 t |
Steel Works | 86 t |