Construction of Northern Pumping Station of Hasanlu Dam

Project start date

2008

Project description

Client West Azerbaijan Regional Water Department
Consultant Puyab Consulting Engineers Co.
Contractor Ghala Co.
Contract Duration 24 Months


Construction of the northern pumping station of Hasanlu Dam was a part a lager project for Water Supply and Construction of Irrigation and Drainage Grid of Naqadeh. The project aims at construction of the northern pumping station of Hasanlu Dam for pressurized irrigation of the agricultural lands in heights of this lake and Lake Urmia as a part of Naqadeh Plane Irrigation and Drainage Grid.

Construction of pumping station, intake structure of the dam, intake tower canals, and transmission lines between intake tower and pumping station, as well as the retaining wall next to the intake are the most important operations of this project.

General Project Specification

Excavation 117000 m3
Backfilling 126000 m3
Formwork 5340 m2
Concreting 2500 m3
Steel Works 360 t