Restoration and Refurbishment of Qotlu Diversion Dam and Correcting Cross Sections and Concrete/Stone Canals in Qotlu and Gogtapeh

Project start date

2007

Project description

Client West Azerbaijan Regional Water Department
Consultant Abkhan Consulting Engineers Co.
Contractor Ghala Co.
Contract Duration 28 Months

 

Restoration and refurbishment of the diversion dam in order to elevate the water level for continuous irrigation of agricultural lands in all seasons, controlling the river flow regime, controlling the floods, and limited protection of urban areas; restoring canals and correcting cross sections of the canals derived from Shahrchay River, gravity irrigation of irrigation lands using intake and stone canals covered by concrete slabs; construction of overpass bridges on the said canals in order to develop a modern irrigation and drainage grid; and preventing waste of water are the most important aspects and goals of this project.

General Project Specifications

Earthworks 245000 m3
Stone Masonry Work 35000 m3
Steel Work 105 t
Formwork 7800 m2
Concreting 8000 m3