Project description
| Client | West Azerbaijan Regional Water Department |
| Consultant | Absaran Consulting Engineers Co. |
| Contractor | Gilban and Ghala Consortium |
| Contract Duration | Contract Duration |
Main Project Objectives
- Regulating the 273 million m3 water flow of Nazlu River to irrigate 431000 hectares of agricultural lands in Nazlu, Rodha, Kohriz, and Ghushchi Planes
- Controlling river floods to prevent damages
- Supply of industrial and drinking water needs of northern townships of Lake Urmia (38-million m3)
- Responding to the environmental needs of Nazlu River in Urmia
- Improving the socioeconomic conditions in the northern parts of the plane
General Specifications of the Dam
| Type | Earthen Dam with Vertical Clay Core |
| Height | 98 m from the bed |
| Length of Crest | 427 m |
| Altitude of Crest | 1502 m above the seas level |
| Reservoir Capacity | 170-Million m3 |
| Access Road | Access Road |