Project description
Client | North Khorasan Regional Water Department |
Consultant | Toosab Consulting Engineer Company |
Contractor | Ghala-Ashnab Consortium |
Contract Duration | 18 Months |
All engineering services, complementary studies and detailed design of the project, procurement of materials and construction of the watertight diaphragm, removal of fill material from the upper shell and restoration of the shell, procurement of watertight wall materials and plastic concrete, complementary injection operations, removal of rocks from the tunnel floor and shotcrete operations, procurement of materials and casting concrete at the upper shell, completion and refurbishment of crest components, repair and reinstallation of instrumentation
Main Project Objectives
– Controlling the flood and regulating water flow of Bidvaz River
– Partial supply of irrigation water needs of the downstream lands
– Partial supply of drinking water needs of Esfarayen and nearby industries
Area of Watertight Wall and Plastic Concrete | 6770 m3 |
Backfill and Riprap | 70300 m3 |
Excavation and Stone Removal | 63850 m3 |
Complementary Watertight Diaphragm Injection | 13 Km |